Cold Storage Construction As a Single EPC Contract

Design, refrigerated panels, refrigeration plant, doors and installation under one Howcool contract. Turn-key delivery for industrial halls — the process published on solutions.html.

EPC Construction

From Drawings to a Commissioned Room

Cold storage construction for an overseas buyer is a coordination problem: the envelope must match the plant, the doors must match the insulation thickness, and the PLC must match the compressor count. Howcool’s published model is to own that chain as EPC — Engineering, Procurement and Construction — rather than handing a packing list to a third installer.

Beijing Howcool Refrigeration Technology Co., Ltd. has operated since 2009 with 15+ years, 500+ projects, 200+ specialised staff and exports to 24+ countries. Construction work uses the catalogue: PU/PIR or EPS or blast panels, monoblock or rack plant (Bitzer, Emerson, Refcomp, Frascold, Hanbell, Copeland as listed), sliding or electric doors, Siemens / Schneider / CHINT controls.

The live six-stage service model is the construction playbook: construction designing, cost budgeting, material and equipment purchasing, constructing and installing, maintenance and service, project starting process. Preliminary design in 24 hours; drawings and quote in 3–5 days; manufacture 20–30 days.

Howcool cold storage construction and installation
Design
Thermal calcs, 3D, construction documents
Panels
PU/PIR, EPS, blast, rockwool, floors
Plant
Monoblock to screw rack and CO₂ cascade
Install
Supervision, commission, train, 24/7

Major Construction References

Completed halls on the live index. Use the cost page for budgeting method and solutions.html for the stage definitions.

Construction Procurement Questions

Is Howcool a panel vendor or an EPC constructor?
Both sit on the live site. About and solutions describe a turn-key EPC contractor: construction designing, cost budgeting, material purchasing, constructing and installing, maintenance. The same company supplies the panels, plant and doors it installs.
What is the construction scope on a typical hall?
Cold storage board, refrigeration units/system and cold storage doors — solutions copy calls this system engineering that must follow the design scheme. Electrical control, HMI and remote monitoring are added where specified. Civil slab and building shell by others unless contracted.
How do you handle overseas installation?
Contact copy lists FOB/CIF quotations, container shipping, on-site installation supervision and export documentation. Kazakhstan’s 500 t CA record cites engineering in Beijing, container shipment, on-site installation by the Kazakhstan-based team and local operator training, 150 days including shipping.
What references should a construction tender look at?
Wuhan Xinpu Logistics Hall (2023), 49,500 m³ food hall, Tianjin Port 5,000 t, Dandong Strawberry CA, −65℃ pharma 400 m², Jamaica food factory. Iraq, Jeddah and Oman pages are feasibility-stage — do not treat them as completed construction.
What warranty starts at handover?
5-year warranty on core components and 24/7 remote support, as published on solutions.html. Panel products also list their own integrity warranties on the product records.

Brief a Construction Package

Share drawings or a sketch with temperature zones and location. Howcool returns a preliminary design from Beijing.

[email protected] · +86 188-1022-1993 · Beijing Howcool Refrigeration Technology Co., Ltd.